Skip to content
← RAIN DESIGN STUDIO / All templatesArchitect website templateBring us your brief ↗
Atelier Volta
Vol. 04 · MMXXVIMonographGenoa · Italia

Buildings,
and the ground
they sit on.

A monograph of the work of Atelier Volta, architects, of the Via di Pré, in Genoa. Compiled from notebook, drawing and photograph between 2011 and 2026.

Frontispiece — Plate I
CORNICE · pietra PIANO NOBILE Plate I · Palazzo Bellandi, Restoration of the Façade, 2018 SCALE 1:200 · SHEET A-101
312Sketches
47Houses
15Years practice
5People
Genoese limestone building facade and terraced garden, subtle architectural restoration
Atelier Volta / Architecture
Contents
  1. A note on the ground.p. 011
  2. On stone, lime and patience.p. 019
  3. Six axioms of the practice.p. 027
  4. Catalogue raisonné — works 2014 → 2026.p. 033
  5. The office and its people.p. 071
  6. A first letter.p. 083

A note on
the ground.

Before a house, a stone. Before a stone, a slope. Before the slope, the rain that made it. We try to remember this, because it is easy to forget.

Our practice begins with the soil and ends with the cornice; the windows and the doors come in between. We have built forty-seven houses, all of them in Liguria or along the upper Tyrrhenian coast, and we have learned that the ground is the principal client. The owner asks for the house; the ground tells you whether it may be built.

We are slow. A house takes us three years between first walk and final coat of lime; some houses have taken five. We do not apologise for this, but neither do we wear it as a badge. It is simply how long the work takes when one is paying attention.

This monograph is the fourth in a series we publish every five years. It contains the work of the practice between 2014 and 2026 — forty-seven projects in all, of which we have chosen sixteen to record in plate and twelve to describe in word. The remainder are listed in the index at the end of the volume.

The plates are drawn by hand, by us, in pencil and India ink, on Fabriano cotton. They are not finished drawings; they are notes about finished drawings. The buildings themselves can be visited, on application, in Genoa and along the coast.

On stone, lime
and patience.

We use, in order of preference: pietra di Finale, mattone genovese, sand-lime mortar, ardesia roofing, oak, brass. Nothing on this list was invented after 1840.

It is not a romantic conviction. It is a practical one. The materials of the old Ligurian coast were chosen by the people who lived there because they worked, in this climate, with these tools, on these slopes. They were chosen by trial over centuries. We have neither the budget nor the time nor the talent to do better.

We use lime mortar rather than cement because cement does not breathe and these old walls die when they cannot breathe. We use ardesia rather than terracotta because ardesia survives the libeccio. We use brass rather than chrome because brass goes brown rather than pitted in salt air.

None of this is, properly, architecture. It is keeping house. But we believe that keeping house is most of what an architect does, and that the rest follows from it.

— § III · Six axioms of the practice —

i.Begin with the ground. Walk it before drawing it; draw it before sleeping on it; sleep on it before quoting on it.
ii.The cornice is not a decoration. It is the line where the wall stops and the sky begins, and it must be drawn with that in mind.
iii.A window is not a hole. It is a piece of the wall that has been left out for a reason. The reason must be defensible.
iv.Do not build what cannot be repaired by a person of average skill, with the tools the village has.
v.Charge by the year, not by the hour. The hours we cannot count; the years we can.
vi.Take three commissions a year; refuse the fourth. The fourth is the one that ruins the other three.
— § IV —

Catalogue raisonné · works 2014 → 2026.

N° 014 · 2014
Casa Sabbioncello
House · LericiPlate IX
N° 018 · 2016
Magazzino Ardesia
Warehouse · ChiavariPlate IV
N° 023 · 2018
Palazzo Bellandi
Restoration · GenovaPlate I
N° 027 · 2019
Villa dell'Ardesia
House · Sestri LevantePlate VI
N° 031 · 2020
Le Due Case
Twin houses · CamogliPlate XI
N° 034 · 2021
Capella dei Saponari
Chapel · LevantoPlate XIV
N° 038 · 2022
Scuola di Pré
School · GenovaPlate VII
N° 041 · 2023
Casa Tre Sorelle
House · PortofinoPlate XII
N° 045 · 2025
Casa di Pietra
House · BonassolaPlate II
— § V —

The office and its people.

RS
Giulia Maria Volta
Director · Born 1972
Trained at Politecnico di Milano and the IUAV, Venice. Founder of the practice, 2011. Daughter of a mason.
RS
Andrea Brancaleone
Partner · Born 1981
Joined the practice in 2014. Leads the workshop and the catalogue of materials. Holds a quiet reputation for cornices.
RS
Elena Conti
Architect · Born 1989
Joined 2017 after time at Snøhetta, Oslo. Leads the school and chapel commissions, and the watercolour archive.
RS
Marco Dal Sasso
Architect · Born 1992
Joined 2021. Site architect for the Lerici and Bonassola houses. Keeps the office bicycle in good order.

— § VI · A first letter —

If you wish
to write to us.

We answer every letter by hand. The first one usually arrives in a small envelope from a kitchen table; we read all of them, and we reply in three to ten days, depending on how busy the post and the season are.

We are slow, intentionally, and we will not be the right office for a project that has already been promised somewhere. But if you are at the beginning, and unsure, write.

Giulia M. Volta
Director · For the office
— A new letter —
A closer look / Atelier Volta

Good buildings begin with the ground.

Share the site, its history and the life you want to build around it.

Bring us your brief
Genoese limestone building facade and terraced garden, subtle architectural restoration
Architecture / A sense of place
From the first sketch

A considered path from idea to place.

01

Understand the site

Light, context, daily routines and the constraints of the property shape the brief.

02

Explore the possibilities

Review layouts, materials and priorities together before committing to a direction.

03

Resolve the details

Agree the scope, the next decisions and the responsibilities that carry the work forward.

Good to know

A few things
you might ask.

What should I bring to the first conversation?

A location, a few photographs and a sense of your priorities are a useful start. Drawings and surveys help when available.

Can we discuss an early-stage idea?

Yes. An initial brief can explore feasibility, priorities and the questions to resolve before a detailed design begins.

How are budgets and timelines established?

They depend on the site, scope and approvals. Request a project-specific proposal before making commitments.

The next step

Bring us your brief.

Share the site, its history and the life you want to build around it.

Save a draft to send to the business. This template does not send messages or confirm bookings.

← Explore the collectionRAIN DESIGN STUDIO / Atelier VoltaBack to top ↑
© 2026 RAIN DESIGN STUDIOMade with ♥ and RAIN DESIGN STUDIO by MrZaKaRiA